Ready To Assemble Kitchen Cabinets
Click here for a FREE no obligation sample
Lowest price guarantee
877-210-6361My Kitchen ProCabinet catalogStart_your_projectDesign_serviceView quote

ASSEMBLY INSTRUCTIONS - BASE CABINET

NEED HELP?

Contact Information : Kitchen Pro Ready To Assemble Kitchen Cabinets
 

INSTALLATION RESOURCES

Research Center
Kitchen Cabinets Glossary
Installation Frequently Asked Questions
 

SITE POLLS

Please rank the ease of assembly:
Assembly is very easy
Assembly is a little complicated
Assembly is very complicated
You need to be an experienced carpenter
 

RECOMMENDED INSTALLATION TOOLS

Flathead / Philips Screwdriver
Required Tool

Electric Screwdriver
Recommended Tool

Rubber Head Hummer
Recommended Tool

3/4" Staples Gun
Recommended Tool

Hot Glue Gun
Recommended Tool
 

CABINETS SELECTION

Click here to browse our cabinets' catalog
 

THESE ASSEMBLY INSTRUCTIONS APPLIES TO THE FOLLOWING STYLES:

Deep Burgundy Kitchen Cabinets Vanilla Glazed Maple Maple Kitchen Cabinets
Deep Burgundy Vanilla Glazed Maple
Click any image to enlarge
STEP 1:
Locate the face frame

It is best to re-install the door after the installation of all cabinets. Otherwise, doors might be damaged during the assembly and installation.

STEP 2:
Remove the doors and the drawer face in order to prevent damaged during the assembly or the installation process.

STEP 3:
Place both side panels into the grooves of the face frame. Make sure to align the metal clips properly (two on each side).

STEP 4:
Slide in the bottom panel into the grooves of the side panels and the face frame.

STEP 5:
Secure all clips using the supplied screws.

STEP 6:
Place the back panel in its' place (make sure all the clips are aligned properly) and secure it.

STEP 7:
Place the toe kick panel and secure it with the metal clips.

STEP 8:
Attach the supplied plastic corner brackets using screws.

STEP 9:
Secure the drawer glides holds to the back panel using the pre-drilled holes for alignment.

STEP 10:
Connect the drawer glides to the drawer glides holders.

STEP 11:
Connect the front of the drawer glide to the face frame. Use any of the pre-drilled holes for alignment.

STEP 12:
Connect the drawer's side panel to the back panel. No screws are needed.

STEP 13:
Connect the other side panel and slide in the bottom panel into the grooves.

STEP 14:
Connect the face frame to the drawer.

STEP 15:
Place the drawer on the drawer glides. Insert the back drawer holder into the pre-drilled hole in the drawer as shown on the left side of the photo.

STEP 16:
Insert the drawer glide pin into the pre-drilled hole on the bottom of the side panel. Use the sheave on the bottom of the pin for adjustments and alignments

STEP 17:
Place the bottom shelves using the supplied shelves holders.
Congratulations, your cabinet is now ready.