|
|
| |
 |
STEP 2 |
 |
|
Insert side panel to the groove of
the frame. |
 |
|
|
| |
 |
STEP 3 |
 |
|
Secure the side panel to the frame
using 1/4'' wide by 3/4'' deep
staples every 6''. |
 |
|
|
| |
 |
STEP 4 |
 |
|
If you are using hot glue (optional,
but recommended) make sure to apply
a thin layer of glue over the
connection of the side panel and the
frame (from the inside of the
cabinet as shown in the photo). |
 |
|
|
| |
 |
STEP 5 |
 |
|
Repeat Steps 3 and 4 with the other
side panel. |
 |
|
|
| |
|
|
| |
 |
STEP 7 |
 |
|
Slide in the back panel starting
from the bottom moving toward the
top. |
 |
|
|
| |
 |
STEP 8 |
 |
|
Make sure both panels are aligned.
Otherwise, it will be very difficult
to level the plywood for the
countertop. |
 |
|
|
| |
 |
STEP 9 |
 |
|
Staple the bottom of the back panel
to secure it to the frame (use 3/4''
staples every 4-6''). |
 |
|
|
| |
|
|
|
|
 |
STEP 11 |
 |
|
Locate the
toe kick plate |
 |
|
|
|
|
 |
STEP 12 |
 |
|
Staple it to the bottom of the
cabinet using 3/4'' staples every
4-6''. |
 |
|
|
|
|
 |
STEP 13 |
 |
Congratulations!
Your cabinet is
now ready.
Please see the
drawer assembly instructions for
further assistance. |
 |
|
|